Case Study 8: Ben manages
IT for a Manufacturing company that produces medical devices.
His staff of 18 includes 12 application developers. In the fourth
quarter of 2006 within a period of four weeks five programmers
left for various reasons (two resignations, one relocated, one
FMLA and one on long term disability). The new system they were
developing was to be deployed next quarter with a conservative
savings estimate of $400,000 a year to the business.
Ben�s company had a choice to make, lose $33,000
in savings monthly or hire experienced consultants to complete
the project and insure that the savings gets realized as quickly
as possible. The payback on the consultant investment was realized
in less than three months. Ben�s choice was easy.
|